Case Studies

These case studies demonstrate our ability to deliver complex structural projects in challenging environments and tight deadlines. We hope they convince you of our commitment to innovation, quality, and client satisfaction.

Multi-Mezzanine Development

Gousto’s interior commercial build took full advantage of our Commercial Interiors specialisation. This project was a multi-tier mezzanine deployment to maximise storage capacity and minimise disruption during the installation. Our teams worked on identifying the optimal location for the mezzanine floors. They ensured the design could effortlessly support the expected storage weight in a streamlined and efficient design structure.

Across the four-week installation period, the quality assurance of the work conducted a 50% increase in storage for the company and greatly enhanced maintenance efficiency and response times.

mezzanine case studies
transfer plates case studies

Safety Features and System Upgrades for Manual Handling System

This client utilised our Mechanical and Electrical expertise for their fulfilment centre, using transfer plates to upgrade their speed-sorting belts. With over 500 of these precision fitted transfer plates installed, we aided in the improving of system efficiency and ensuring durability. Our team completed this job during non-peak hours, ensuring no interruptions and the sorting process was able to remain operational.

Our upgrades optimised work for our client, reducing errors and increasing efficiency, subsequently improving system safety and providing better protection for workers.

Acoustic Sound Baffle Ceiling Installation

Gousto’s offices required enhance sound quality in their offices and workspaces. Our installation of 80 acoustic sound baffles achieved this intent. The project was carefully designed to use high-quality materials to integrate with the existing aesthetic style. Our team created the baffle design by enhancing spatial dynamics with overall performance and style.

The seamless integration of the installation provides a modern look, while reducing noise levels to increase productivity and enhance employee focus. With a noticeable improvement in the workplace, case studies such as these highlight our abilities to contribute projects which promote collaboration.

sound baffle case studies
transfer plates case studies

Custom Decant Fabrication

Our client, Gousto, required efficient and durable decant stations to match the business growth and operational demands. With 48 custom decant stations, we tailored the project to the specifications of Gousto’s warehouse, to ensure long-lasting efficiency with minimal need for maintenance, leading to long-term cost efficiency. Given the harsh temperature conditions, needed for maintenance the meal-kit’s fresh ingredients, we chose materials which were resilient to cold storage.

Overall, the long term benefits of our installation include reduced risks, increased efficiency, and safer processes moving forward.

Partition Metal Fence Installation

Amazon utilised our Commercial Interiors service to work on a security improvement. The main goal of this project was the installation of a consistently reliable partition metal fence, restricting unauthorised access to sensitive equipment and operational sections of the distribution centre. With a strict deadline of two-weeks, our team worked hard to ensure compliance with safety protocols and install the fencing with minimal disruption.

With Amazon handling high-volume and time-sensitive tasks, efficient project and time management was crucial to this project. By the end of the two-weeks, the fence was ready to enhance security and aided in clearly defining access route for employees.

partition fence case studies
transfer plates case studies

Emergency Refurbishment

After a sudden water leak damaged several key areas of our client’s office space, they hired us to implement a quick and thorough refurbishment. With bathroom facilities, a reception area, a large office with a connecting kitchen, three meeting rooms, and more having been damaged by the leak, our team applied collaborative project management skills to ensure that all the areas were handled with minimal interference to operations.

By assessing the impacted areas in detail, we prioritised the areas needing immediate attention, and allowed to us provide solutions to avoid and prevent future problems. Read through the case study PDF for more details on the careful application of fresh and long-lasting materials.